Punjab 4 is a 150 MW project, representing a portfolio of three projects of 50 MW each, for which PPA was signed with Punjab State Power Corporation Limited at a weighted average tariff of Rs 5.63 per kilowatt hour for 25 years.
All Projects Page
- 2016North India’s largest private solar power plant at commissioningPunjab State Power Corporation Limited(Dist: Fazilka, Muktasar, Bhathinda), Punjab150 MW
Andhra Pradesh 2 is a 100MW project for which the PPA was signed with NTPC Limited with a tariff of Rs 5.12 per kilowatt-hour for 25 years. The project commenced operations in 2017.
2017NTPC LimitedKurnool, Andhra Pradesh100 MWTelangana 1 is a 100MW project under the Phase II Batch II State Specific Bundling Scheme of JNNSM for which the PPA has been signed with NTPC Limited for a tenure of 25 years with a tariff of Rs. 4.67 per kilowatt-hour. The project commenced operations in 2018.
2018NTPC Limited(Dist: Rachur, Jillella, Marchala, Rachallapalli, Veljala), Telangana100 MW